We are
currently providing Thermo Imaging of large electrical systems from
coast to coast, border to border. The majority of sites are in excess
of 1.5 million square feet, but the small installation needs predictive
maintenance and problem solving also. With our testing services and
procedures being used by utility companies, manufacturing firms, large
distribution warehouses, or your local retail shop, we can predict
electrical burn out or failure in time to prevent costly downtime
and or loss of product and in some cases life. In conjunction with
our Thermographic pictures we also employ recording meters, etc...
as the situation or the customer requires.
|
HB
3 BRANCH BREAKERS
|
Image
Path F:\DC#6047\IR\IR00061.ISI
Image Date/Time Wednesday, September 05, 2001 2:02:17 PM
Report Date/Time Saturday, October 13, 2001 3:41:04 PM
Temp Unit Fahrenheit
Location DC #6047
Area PERISHABLE RECEIVING - PRODUCE DOCK
Target HB 3 BRANCH BREAKERS
Data:
Label Emissivity Background Average Std Dev Max Min
A1 1 58.96 79.82 7.84 96.6 68.6
A2 1 58.96 85.53 10.80 104.5 72.2
A3 1 58.96 77.46 6.51 96.1 65.9
A4 1 58.96 78.18 6.32 95.4 65.8
Comments:
Hot spot at circuits 10/12 (2P20A) lighting. Found very loose
connection - wire to breaker. Cut loose and re-terminated. Cleared
hot spot. Also tightened circuit #5 wire to breaker. Checked
connection on circuit 9/11, tightened slightly. Circuit pulling
14 ½A per phase. All others in panel pulling 6-10A.
|
Image
Path C:\DC#6071WINTERHAVEN\IR2-RS\IR00077.ISI
Image Date/Time Thursday, November 29, 2001 10:05:04 AM
Report Date/Time Friday, December 07, 2001 9:17:15 PM
Temp Unit Fahrenheit
Location DC #6071
Area ENERGY CENTER
Target C3 STARTER CABINET LUGS
Data:
Label Emissivity Background Average Std Dev Max Min
A1 1 76.96 98.47 6.92 120.4 84.8
Comments:
Checked torque on Phases "A" & "C" secondary
side (2nd lug). Tightened Phase "A" by 1 turn and
Phase "C" by 3 turns.
|
|
Just
a few examples of how Thermal Imaging works
and the information available for your trouble shooting needs.
|
|
|